A map of the first wetlands mitigation banking instrument for the Department of Defense in Maryland is shown during a ceremonial commemoration event on Joint Base Andrews, Md., Sept. 6, 2018. The entire project yields nearly 38 wetland credits and almost 1,600 stream credits to provide potential mitigation for planned construction efforts on JBA, such as runway construction or expansion. (U.S. Air Force photo by Airman 1st Class Michael S. Murphy)
Date Taken: | 09.06.2018 |
Date Posted: | 09.07.2018 15:21 |
Photo ID: | 4708008 |
VIRIN: | 180906-F-SP573-1012 |
Resolution: | 6951x4844 |
Size: | 19.97 MB |
Location: | JOINT BASE ANDREWS, MARYLAND, US |
Web Views: | 22 |
Downloads: | 3 |
This work, JBA to build wetlands bank at Mattawoman Creek [Image 5 of 5], by SSgt Michael Murphy, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.