Prepping a punch block before it can be installed.
Date Taken: | 09.15.2011 |
Date Posted: | 10.11.2011 08:19 |
Photo ID: | 471999 |
VIRIN: | 110915-A-IW172-002 |
Resolution: | 5184x3456 |
Size: | 4.68 MB |
Location: | AF |
Web Views: | 16 |
Downloads: | 1 |
This work, 580th Signal OSP prepping and conducting a site Survey [Image 14 of 14], by SFC Richard Lutz, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.