U.S. Army Corps of Engineers Task Force Recovery Commander MAJ Scotty Autin tours the two mega-generators installed at the Palo Seco power substation, Puerto Rico, September 13, 2018.
Three mega-generators were installed to stabilize grid power on the island, and have produced over 510,000 MW of power to date.
Date Taken: | 09.13.2018 |
Date Posted: | 09.14.2018 09:06 |
Photo ID: | 4731847 |
VIRIN: | 180913-A-IF251-089 |
Resolution: | 6000x4000 |
Size: | 12.05 MB |
Location: | PALO SECO, PR |
Web Views: | 60 |
Downloads: | 6 |
This work, Mega-generator [Image 10 of 10], by Andrew Kornacki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.