180914-N-SH284-0037 PORT ANGELES, Wash. (Sept. 14, 2018) A crowd looks on as Theo Cragg, the operations management department head of Strategic Weapons Facility Pacific, speaks during a ribbon-cutting ceremony for the official opening of the Transit Protection System facilities at the U.S. Coast Guard Air Station Sector Field Office, Port Angeles. The project consisted of constructing a pier, utility trestle, and an alert forces facility which will meet the U.S. Coast Guard’s personnel requirements when they provide escort services to the Navy’s submarine forces. (U.S. Navy photo by Mass Communication Specialist 2nd Class Vaughan Dill/Released)
Date Taken: | 09.14.2018 |
Date Posted: | 09.15.2018 18:52 |
Photo ID: | 4735486 |
VIRIN: | 180914-N-SH284-0037 |
Resolution: | 4128x2752 |
Size: | 1001.12 KB |
Location: | PORT ANGELES, WASHINGTON, US |
Web Views: | 20 |
Downloads: | 5 |
This work, Transit Protection System Construction at Port Angeles’ Ediz Hook Concludes [Image 8 of 8], by Vaughan Dill, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.