U.S. Air Force Staff Sgt. Channing Henry, 31st Expeditionary Rapid Engineer Deployable Heavy Operation Repair Squadron Engineer pavement and equipment journeyman, operates an asphalt paver on a test strip at Nigerien Air Base 201, Niger, Oct. 19, 2018. Airmen evaluate the equipment and materials several times before laying down the actual runway. (U.S. Air Force photo by Tech. Sgt. Rachelle Coleman)
Date Taken: | 10.19.2018 |
Date Posted: | 10.24.2018 08:10 |
Photo ID: | 4841065 |
VIRIN: | 181019-F-QH302-0003 |
Resolution: | 5568x3712 |
Size: | 1.78 MB |
Location: | AGADEZ, NE |
Web Views: | 42 |
Downloads: | 12 |
This work, RED HORSE tests materials, equipment for future flight line [Image 7 of 7], by MSgt Rachelle Coleman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.