Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers Improve Camp Arifjan Drainage [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineers Improve Camp Arifjan Drainage

    CAMP ARIFJAN, KUWAIT

    11.28.2018

    Photo by Spc. Adam Parent 

    U.S. Army Central   

    A U.S. Army Soldier with the 526th Engineer Construction Company, 92nd Engineer Battalion, 28th Engineer Brigade, measures the depth of a trapezoidal ditch being dug at Camp Arifjan, Kuwait, Nov. 28, 2018. U.S. Army Capt. Bryan Thompson, the commander of the 526th ECC, said, “The one thing I really want to highlight is, I'm really blessed to have such a great team.” The Soldiers of the 526th ECC conducted constant operations to immediately resolve flooding earlier in the month, and continue to improve drainage features at Camp Arifjan with projects like this ditch. (U.S. Army photo by Sgt. Adam Parent)

    IMAGE INFO

    Date Taken: 11.28.2018
    Date Posted: 12.03.2018 02:20
    Photo ID: 4934791
    VIRIN: 181128-A-XL723-663
    Resolution: 5436x3058
    Size: 3.42 MB
    Location: CAMP ARIFJAN, KW

    Web Views: 46
    Downloads: 6

    PUBLIC DOMAIN