Ongoing construction at the U.S. Army Corps of Engineers Buffalo District's Harpersfield Dam project in Geneva, Ohio, December 13, 2018. Current work removing sediment and excavating abutment walls is aided by a water diversion system serving as a temporay dam. The District is constructing a new sea lamprey barrier to keep invasive lamprey out of the upper reaches of the Grand River, a designated wild and scenic river.
This project is funded by the Great Lakes Restoration Initiative, a multi-agency coalition committed to creating a new standard of care that will leave the Great Lakes better for the next generation.
Date Taken: | 12.13.2018 |
Date Posted: | 12.13.2018 14:54 |
Photo ID: | 4971844 |
VIRIN: | 181213-A-PG036-081 |
Resolution: | 6000x4000 |
Size: | 11.92 MB |
Location: | US |
Web Views: | 52 |
Downloads: | 6 |
This work, Ongoing construction at Buffalo District's Harpersfield Dam project [Image 9 of 9], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.