181016-N-FD244-0009
BREMERTON, Washington (Oct.16, 2018) Members of the Puget Sound Naval Shipyard & Intermediate Maintenance Facility's USS Nimitz (CVN 68) project team observe as work continues to install a propeller on the carrier during its docking planned incremental availability at the shipyard. (U.S. Navy photo by Brian Kilpatrick/Released)
Date Taken: | 10.16.2018 |
Date Posted: | 12.18.2018 17:08 |
Photo ID: | 4985393 |
VIRIN: | 181016-N-FD244-0009 |
Resolution: | 5350x5890 |
Size: | 12 MB |
Location: | BREMERTON, WASHINGTON, US |
Web Views: | 188 |
Downloads: | 23 |
This work, Nimitz propeller installation [Image 5 of 5], by Brian Kilpatrick, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.