USACE Black Rock Lock employees, the Buffalo District Dive Team and USACE Pittsburgh District Regional Rivers Repair Fleet (R3F) continue work on the Black Rock Lock gate repairs, including the drilling of concrete to access the anchorage needing repair, Buffalo, NY, December 17, 2018. The repairs will improve the Black Rock Lock infrastructure and sustain the functionality for future navigation seasons.
Date Taken: | 12.17.2018 |
Date Posted: | 12.28.2018 12:43 |
Photo ID: | 5003718 |
VIRIN: | 181217-A-PG036-483 |
Resolution: | 6000x4000 |
Size: | 6.31 MB |
Location: | US |
Web Views: | 2 |
Downloads: | 3 |
This work, Drilling through concrete [Image 18 of 18], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.