A photo is taken of the Great Bridge Lock along the Atlantic Intracoastal Waterway, Chesapeake, Virginia, Feb. 13, 2019. The U.S. Army Corps of Engineers is slated to replace three of eight chamber valves along the AIWW. (U.S. Army photo by Andria Allmond)
Date Taken: | 02.13.2019 |
Date Posted: | 02.19.2019 09:58 |
Photo ID: | 5114006 |
VIRIN: | 190213-A-SO401-1042 |
Resolution: | 3456x2304 |
Size: | 4.17 MB |
Location: | CHESAPEAKE, VIRGINIA, US |
Web Views: | 60 |
Downloads: | 4 |
This work, Great Bridge Lock scheduled for chamber valve replacement [Image 4 of 4], by Andria Allmond, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.