Sgt. 1st Class Elain ColonSilva, a Petroleum and Water Department instructor, stands on one of two new piers at the Mechling River Training Site along River Road where he shared details and safety information about the structures during a Feb. 12 tour for Quartermaster School leaders and PWD instructors. The piers will allow water treatment specialist students to operate equipment more safely on the banks of the Appomattox River.
Date Taken: | 02.12.2019 |
Date Posted: | 02.21.2019 08:57 |
Photo ID: | 5119666 |
VIRIN: | 190212-A-US054-846 |
Resolution: | 3024x1854 |
Size: | 7.61 MB |
Location: | US |
Web Views: | 35 |
Downloads: | 3 |
This work, Water Dawgs: Quartermaster School improves training site for riverside ops [Image 2 of 2], by Terrance Bell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.