Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Army Reserve engineers make progress on construction projects during first rotation of Beyond the Horizon 2019 [Image 1 of 19]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    U.S. Army Reserve engineers make progress on construction projects during first rotation of Beyond the Horizon 2019

    HUEHUETENANGO, GUATEMALA

    05.13.2019

    Photo by Sgt. Christina Dion 

    319th Mobile Public Affairs Detachment

    Pfc. Nathan Rupert, assigned to the 358th Engineer Company, a U.S. Army Reserve unit based in New Cumberland, Penn., digs and widens the sewage pipe hole at the Puesto Salud Tojocaz medical clinic construction site in Huehuetenango, Guatemala, May 15, 2019 as part of exercise Beyond the Horizon. Beyond the Horizon is an annual exercise and this year consists of four new construction projects and five medical readiness training exercises within Guatemala designed to improve the operational readiness of U.S. Forces. (U.S. Army photo by Sgt. Christina M. Dion)

    IMAGE INFO

    Date Taken: 05.13.2019
    Date Posted: 05.17.2019 17:29
    Photo ID: 5374947
    VIRIN: 190514-A-ZG808-060
    Resolution: 1366x2048
    Size: 1.98 MB
    Location: HUEHUETENANGO, GT
    Hometown: NEW CUMBERLAND, PENNSYLVANIA, US

    Web Views: 597
    Downloads: 5

    PUBLIC DOMAIN