190327-N-AT791-069
GULFPORT, Mississippi (June 4, 2019) Members assigned to Naval Mobile Construction Battalion (NMCB) 133, Extend Parking Lot for Warehouse 203 located on Naval Construction Battalion Center, Gulfport, Mississippi, rake and shovel concrete as its placed to make it level in preparation for the screed, while others start the finishing work by edging. NMCB 133 provides general engineering and construction readiness operations to 22 Naval Construction Regiment operational missions. (U.S. Navy photo by Builder 2nd Class Brooke Davendonis/Released)
Date Taken: | 03.27.2019 |
Date Posted: | 06.12.2019 10:49 |
Photo ID: | 5474706 |
VIRIN: | 190327-N-AT791-069 |
Resolution: | 624x416 |
Size: | 80.35 KB |
Location: | US |
Web Views: | 25 |
Downloads: | 4 |
This work, NMCB 133 Det Gulfport Places Concrete [Image 10 of 10], by PO1 George Bell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.