U.S. Army Corps of Engineers, New Orleans District employees respond to the after effect of Hurricane Barry, placing sandbags to strengthen temporary closures while pumps unwater the site, allowing construction operations to continue, July 14, 2019.
The Corps of Engineers, in collaboration with its partners, is committed to leveraging all of its resources in response to the reduce long term risk.
Date Taken: | 07.14.2019 |
Date Posted: | 07.14.2019 18:44 |
Photo ID: | 5578035 |
VIRIN: | 190714-A-IF251-024 |
Resolution: | 6000x4000 |
Size: | 9.32 MB |
Location: | NEW ORLEANS, LOUISIANA, US |
Web Views: | 7 |
Downloads: | 3 |
This work, Delivering Stong Projects [Image 7 of 7], by Andrew Kornacki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.