U.S. Air Force Airmen from the 633rd Civil Engineering Squadron build a tent during a total force exercise at Joint Base Langley-Eustis, Virginia, Feb. 25, 2019. The 1st Fighter Wing and the 192nd Wing partnered with 633rd Air Base Wing during the Phase 1 exercise to showcase their readiness and deployability of the F-22s. (U.S. Air Force photo Senior Airman Anthony Nin Leclerec)
Date Taken: | 02.25.2019 |
Date Posted: | 09.17.2019 10:08 |
Photo ID: | 5756577 |
VIRIN: | 190225-F-ML658-1171 |
Resolution: | 5788x4134 |
Size: | 1.95 MB |
Location: | JOINT BASE LANGLEY-EUSTIS, VIRGINIA, US |
Web Views: | 17 |
Downloads: | 11 |
This work, JBLE total force Phase I [Image 7 of 7], by SSgt Anthony Nin Leclerec, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.