Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Getting USNS Grasp Ready for Triggerfish 2019 [Image 4 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Getting USNS Grasp Ready for Triggerfish 2019

    MICRONESIA, FEDERATED STATES OF

    10.11.2019

    Photo by Petty Officer 2nd Class Omar-Kareem Powell  

    Commander Task Force 75

    191011-N-SS432-0054
    PACIFIC OCEAN (Oct. 11, 2019) Sailors assigned to Underwater Construction Team Two (UCT 2) measuring PVC pipe for a free air space modification to a 40-pound crating charge on the back deck of the USNS Grasp (T-ARS 51) during Triggerfish 2019, a U.S. Third Fleet-led mission that employs expeditionary forces to conduct hydrographic surveys and clear hazards to navigation in the Federated States of Micronesia. UCT 2 ensures a free and open Indo-Pacific by providing waterfront and underwater engineering, construction, repair, and inspection in support of Navy and Marine Corps operations and is capable of performing complex inshore and deep ocean underwater construction tasks. (U.S. Navy photo by Mass Communication Specialist 2nd Class Omar Powell)

    IMAGE INFO

    Date Taken: 10.11.2019
    Date Posted: 10.17.2019 02:22
    Photo ID: 5838110
    VIRIN: 191011-N-SS432-1054
    Resolution: 2203x1552
    Size: 3.11 MB
    Location: FM

    Web Views: 46
    Downloads: 3

    PUBLIC DOMAIN