Navy Seabees with the Naval Mobile Construction Battalion 22, are building a schoolhouse near the Ramon Amay Amador construction site. The project is near 70 percent completion.
Date Taken: | 05.17.2012 |
Date Posted: | 05.21.2012 20:55 |
Photo ID: | 584702 |
VIRIN: | 120517-A-TB817-002 |
Resolution: | 4288x2848 |
Size: | 2.53 MB |
Location: | HN |
Web Views: | 29 |
Downloads: | 1 |
This work, Beyond the Horizon Honduras construction sites make steady progress [Image 5 of 5], by Sarah Lupescu, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.