U.S. Air Force Senior Airman Arron Canady-Post, 355th Equipment Maintenance Squadron A-10 Thunderbolt II crew chief, works on the wing of an A-10 at Davis-Monthan Air Force Base, Arizona, Nov. 5, 2019. Airmen assigned to the 355th EMS A-10 Phase Section are tasked to perform detailed inspections to ensure A-10s uphold war-ready status. (U.S. Air Force photo by Airman 1st Class Jacob T. Stephens)
Date Taken: | 11.05.2019 |
Date Posted: | 11.26.2019 17:27 |
Photo ID: | 5941032 |
VIRIN: | 191105-F-CJ465-1049 |
Resolution: | 5071x4056 |
Size: | 11.28 MB |
Location: | TUCSON, ARIZONA, US |
Web Views: | 8 |
Downloads: | 4 |
This work, Brrreaking it down, building it up [Image 7 of 7], by SSgt Jacob Stephens, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.