Staff Sgt. Oliver Walker, right, and Senior Airman Gregory Obin, Air Force Engineering Installation installers, remove disturbed earth from the work area so the team can continue to progress with the current project at Camp Taji, Iraq, Sep. 12, 2019. The team’s capabilities stretch from pre-installation engineering and planning, to full infrastructure installation, restoration and clean-up. (U.S. Air Force photo by Staff Sgt. Luke Kitterman)
Date Taken: | 09.12.2019 |
Date Posted: | 12.09.2019 18:44 |
Photo ID: | 5966773 |
VIRIN: | 190912-F-VE588-0013 |
Resolution: | 4490x2993 |
Size: | 1.85 MB |
Location: | TAJI AIR BASE, IQ |
Web Views: | 18 |
Downloads: | 5 |
This work, Air Force EI team spark communication improvements at Camp Taji [Image 30 of 30], by TSgt Luke Kitterman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.