200107-N-TP832-1013 PORT HUENEME, Calif. (Jan. 7, 2020) Builder Constructionman Dillon Chavez, from Hermosa Beach, Calif., and assigned to Naval Mobile Construction Battalion 3, adjusts the level of scaffolding to deconstruct a pre-engineered building during a Seabee Technical Trainer evolution on board Naval Base Ventura County, Port Hueneme. Seabees are the expeditionary engineering and construction experts of the naval service. They provide task-tailored, adaptable and combat-ready engineering and construction forces that deploy to support Navy objectives globally. (U.S. Navy photo by Mass Communication Specialist 2nd Class Michael Lopez/Released)
Date Taken: | 01.07.2020 |
Date Posted: | 01.07.2020 14:06 |
Photo ID: | 6014541 |
VIRIN: | 200107-N-TP832-1013 |
Resolution: | 4501x2996 |
Size: | 1.41 MB |
Location: | PORT HUENEME, CALIFORNIA, US |
Hometown: | HERMOSA BEACH, CALIFORNIA, US |
Web Views: | 37 |
Downloads: | 6 |
This work, Seabees Conduct Pre-engineered Building Training [Image 8 of 8], by PO1 Michael Lopez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.