Guayanilla, PR, January 29, 2020 -- A new floor is installed at he municipality's Base Camp for survivors of the recent 6.4 earthquake. Photo by Liz Roll/FEMA
Date Taken: | 01.29.2020 |
Date Posted: | 02.01.2020 10:58 |
Photo ID: | 6064017 |
VIRIN: | 200129-O-LR493-659 |
Resolution: | 4016x6016 |
Size: | 13.62 MB |
Location: | US |
Web Views: | 2 |
Downloads: | 1 |
This work, New Floor Installed at Base Camp in Guayanilla [Image 25 of 25], by Liz Roll, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.