200131-N-SS432-0102 SANTA RITA, Guam (Jan. 31, 2020) Builder 1st Class Lance Fairchild conducts a pre-dive brief with Sailors assigned to Underwater Construction Team (UCT) TWO Construction Dive Detachment Charlie (CDD/C). The Seabee divers are performing maintenance on navigational buoys in the harbor at Naval Base Guam. (U.S. Navy photo by Mass Communication Specialist 1st Class Omar-Kareem L. Powell / Released)
Date Taken: | 01.31.2020 |
Date Posted: | 02.06.2020 20:53 |
Photo ID: | 6079231 |
VIRIN: | 200131-N-SS432-0102 |
Resolution: | 3000x2117 |
Size: | 4.01 MB |
Location: | SANTA RITA, GU |
Web Views: | 39 |
Downloads: | 13 |
This work, Navigational Buoy Maintenance [Image 9 of 9], by PO1 Omar-Kareem Powell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.