Crews install a three-ton, 30-foot barrier panel at the Barry M. Goldwater Range along the U.S.-Mexico border near Yuma, Arizona, March 3, 2020. BMGR 10-27 includes 31 miles of border barrier. USACE is providing direction and oversight for Department of Defense (DOD)-funded construction of border barrier projects from California to Texas. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in response to the Presidential national emergency declaration dated Feb. 15, 2019, requiring the use of the armed forces and authorizing the use of Title 10, U.S. Code, § 2808.
(Some personal and corporate identifiable markings have been masked for privacy reasons. No one in this photo crossed the international border).
Date Taken: | 03.02.2020 |
Date Posted: | 03.14.2020 20:47 |
Photo ID: | 6139202 |
VIRIN: | 200302-A-NJ924-0004 |
Resolution: | 4032x3024 |
Size: | 1.2 MB |
Location: | YUMA, ARIZONA, US |
Web Views: | 94 |
Downloads: | 4 |
This work, Crews install a three-ton, 30-foot barrier panel at the Barry M. Goldwater Range, by Jay Woods, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.