Maj. Jacob Austin helped procure partitions being set up April 2 to form care units on the floor of the CenturyLink Field Event Center in downtown Seattle, Washington. The site is undergoing a major transformation from a sports arena to a world-class Army hospital to help free up bed space in local hospitals and allow local medical professionals to focus on providing care to COVID-19 patients. Once complete on April 7, the hospital will feature 48 intensive care unit, 120 intermediate care and 82 minimum care beds, two emergency rooms and three operating rooms as well as a pharmacy lab and X-ray department. Austin is a 615th Contracting Team leader from Joint Base Lewis-McChord, Washington.
Date Taken: | 04.02.2020 |
Date Posted: | 04.06.2020 15:13 |
Photo ID: | 6163965 |
VIRIN: | 200402-A-YN999-004 |
Resolution: | 2496x2046 |
Size: | 1.09 MB |
Location: | SEATTLE, WASHINGTON, US |
Web Views: | 29 |
Downloads: | 3 |
This work, MICC contracts support Seattle’s CenturyLink medical transformation [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.