Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Connecticut National Guard builds capacity at Stamford Hospital [Image 7 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Connecticut National Guard builds capacity at Stamford Hospital

    STAMFORD, CONNECTICUT, UNITED STATES

    04.08.2020

    Photo by Staff Sgt. Steven Tucker 

    103rd Airlift Wing, Bradley Air National Guard Base

    Airmen from the 103rd Airlift Wing construct a bed frame at Stamford Hospital in Stamford, Connecticut, April 8, 2020. Connecticut National Guard Soldiers and Airmen set up 200 beds at the hospital to build capacity and constructed Alaskan Small Shelter System tents for a separate triage area in response to the COVID-19 pandemic (U.S. Air National Guard photo by Staff Sgt. Steven Tucker)

    IMAGE INFO

    Date Taken: 04.08.2020
    Date Posted: 04.08.2020 16:41
    Photo ID: 6166635
    VIRIN: 200408-Z-DY403-066
    Resolution: 6180x4414
    Size: 7.62 MB
    Location: STAMFORD, CONNECTICUT, US

    Web Views: 35
    Downloads: 3

    PUBLIC DOMAIN