Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    241st Engineering Installation Squadron installs fiber optic cable at McGhee Tyson Air National Guard Base [Image 1 of 20]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    241st Engineering Installation Squadron installs fiber optic cable at McGhee Tyson Air National Guard Base

    KNOXVILLE, TENNESSEE, UNITED STATES

    03.12.2020

    Photo by Tech. Sgt. Teri Eicher 

    134th Air Refueling Wing

    Master Sgt. Stefan Gonser, cable and antenna systems team chief, pulls fiber optic cable through underground tunnels at McGhee Tyson Air National Guard Base March 12, 2020. Recently, members of the 241st Engineering Installation Squadron, a geographically separated unit of the 134th Air Refueling Wing, began work on a massive project to install new fiber optic cables to the 134th ARW. The project, taking over a month to complete, includes the heavy, dirty work of installing cable and the fine, delicate work of soldering the individual filaments of the cable and splicing them into each building. The cable and antenna systems Airmen of the 241st EIS are trained to complete each stage of the job from start to completion, often performing their duties under austere conditions to establish communications in new locations.

    IMAGE INFO

    Date Taken: 03.12.2020
    Date Posted: 04.17.2020 15:54
    Photo ID: 6177676
    VIRIN: 200312-Z-GX596-021
    Resolution: 6016x4016
    Size: 3.06 MB
    Location: KNOXVILLE, TENNESSEE, US

    Web Views: 17
    Downloads: 1

    PUBLIC DOMAIN