1st Lt. David White, Air Force Central Command A6/7 Engineering Installation Squadron engineer, emerges from a manhole at Ali Al Salem Air Base, Kuwait, May 15, 2020. Engineering Installation Airmen specialize in building infrastructure and providing telecom solutions throughout the Area of Responsibility. E&I Squadrons are a mixture of communications, radar, and engineering specialists to maximize innovation and improvements for the future of installations. (U.S. Air Force photo by Senior Airman JaNae Capuno)
Date Taken: | 05.15.2020 |
Date Posted: | 05.18.2020 09:59 |
Photo ID: | 6213281 |
VIRIN: | 200515-F-WN543-1033 |
Resolution: | 7360x4912 |
Size: | 7.68 MB |
Location: | ALI AL SALEM AB, KW |
Web Views: | 28 |
Downloads: | 7 |
This work, Engineering Installation Airmen bring the future faster [Image 14 of 14], by SSgt JaNae Jensen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.