Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Navy Seabees with NMCB-5’s Detail Sasebo construct two pre-engineered buildings for Naval Beach Unit 7 [Image 4 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    U.S. Navy Seabees with NMCB-5’s Detail Sasebo construct two pre-engineered buildings for Naval Beach Unit 7

    SASEBO, AICHI, JAPAN

    06.11.2020

    Courtesy Photo

    Naval Mobile Construction Battalion 5

    200611-N-ZW591-1048 SASEBO, Japan (June 11, 2020) Utilities Constructionman Daniel Silvester, from Sydney, secures stirrups by tying them into place for reinforcing steel grade beams. U.S. Navy Seabees with Naval Mobile Construction Battalion (NMCB) 5’s Detail Sasebo are constructing two pre-engineered buildings for Naval Beach Unit 7 at Yokose, Japan. NMCB-5 is deployed across the Indo-Pacific region conducting high-quality construction to support U.S. and partner nations to strengthen partnerships, deter aggression, and enable expeditionary logistics and naval power projection. (U.S. Navy photo by Steelworker 2nd Class Douglas Dooley)

    IMAGE INFO

    Date Taken: 06.11.2020
    Date Posted: 06.19.2020 23:55
    Photo ID: 6246924
    VIRIN: 200611-N-ZW591-1048
    Resolution: 1008x756
    Size: 255.65 KB
    Location: SASEBO, AICHI, JP

    Web Views: 34
    Downloads: 1

    PUBLIC DOMAIN