Airmen assigned to the 911th Maintenance Squadron perform a home station check inspection of a C-17 Globemaster III at the Pittsburgh International Airport Air Reserve Station, Pennsylvania, June 30, 2020. Airmen performed the first-ever HSC in the new two-bay hangar that was built as part of the 911th Airlift Wing’s ongoing aircraft conversion. (U.S. Air Force photo by Joshua J. Seybert)
Date Taken: | 06.30.2020 |
Date Posted: | 06.30.2020 14:11 |
Photo ID: | 6256778 |
VIRIN: | 200630-F-UJ876-1017 |
Resolution: | 5568x3712 |
Size: | 6.76 MB |
Location: | PITTSBURGH INTERNATIONAL AIRPORT AIR RESERVE STATION, PENNSYLVANIA, US |
Web Views: | 33 |
Downloads: | 4 |
This work, Tunneling inspection [Image 5 of 5], by Joshua Seybert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.