Airman 1st Class Kayla Moore (left) and Tech. Sgt. Kenneth Abraham (right), 7th Operations Support Squadron airfield management, discuss the status of ongoing construction for a C-130 ramp project at Dyess Air Force Base, Texas, June 29, 2020. The purpose of the project is to repair sections of the flight line that have been damaged over time due to regular wear and tear on the concrete. (U.S. Air Force photo by 2nd Lt. Daniel Barnhorst)
Date Taken: | 06.29.2020 |
Date Posted: | 07.01.2020 13:39 |
Photo ID: | 6259737 |
VIRIN: | 200629-F-NM802-1001 |
Resolution: | 2864x1784 |
Size: | 2.98 MB |
Location: | DYESS AIR FORCE BASE, TEXAS, US |
Web Views: | 23 |
Downloads: | 3 |
This work, Dyess AFB flight line maintains 24-hour operations during pandemic [Image 3 of 3], by Capt. DanielDaniel Barnhorst, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.