Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Army Corps of Engineers-led projecct to build new barracks continues at Fort McCoy [Image 39 of 71]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Army Corps of Engineers-led projecct to build new barracks continues at Fort McCoy

    An area of the 1600 block of the cantonment area of the installation is shown July 16, 2020, where a new multi-million dollar barracks is being built at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build the barracks in September 2019. The planned completion date is currently August 2021. The planned barracks will be different than the traditional barracks that are located throughout the installation. This new building will be four stories and be able to house 400 people in approximately 60,000 square feet. The project also is the first of eight new buildings planned for the entire 1600 block. The plan is to build three more barracks with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This is an Army Corps of Engineers-managed project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 07.16.2020
    Date Posted: 08.21.2020 17:07
    Photo ID: 6323323
    VIRIN: 200716-A-OK556-240
    Resolution: 5659x3773
    Size: 2.29 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 1
    Downloads: 5

    PUBLIC DOMAIN