Engineers from the 459th Engineer Company from Bridgeport, W. Va. tighten down sections of an Improved Ribbon Bridge on the Arkansas River during River Assault 2012. Combat engineers from all over the country assembled to construct the 293 meter bridge in three hours. U.S. Army photo by Spc. Bradley Miller
Date Taken: | 07.26.2012 |
Date Posted: | 08.01.2012 16:26 |
Photo ID: | 637284 |
VIRIN: | 120725-A-KY778-356 |
Resolution: | 4288x2848 |
Size: | 5.85 MB |
Location: | FT. CHAFFEE, ARKANSAS, US |
Hometown: | BRIDGEPORT, WEST VIRGINIA, US |
Web Views: | 55 |
Downloads: | 19 |
This work, Tighten Up [Image 14 of 14], by SFC Brad Miller, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.