The new freeze seal trailers at America’s Shipyard provide the Shop 56 team with an area to get freeze seals done right as safe and quickly as possible. The trailers are insulated to lower the amount of noise inside. In addition, a split air conditioning unit is used to regulate temperatures inside to keep everything running smoothly. And because these trailers are mobile, the team can launch wherever they are needed.
Date Taken: | 10.01.2020 |
Date Posted: | 12.08.2020 07:08 |
Photo ID: | 6446937 |
VIRIN: | 201001-N-XX785-006 |
Resolution: | 5461x3641 |
Size: | 3.46 MB |
Location: | PORTSMOUTH, VIRGINIA, US |
Web Views: | 12 |
Downloads: | 3 |
This work, NNSY Piping Team Stands Ready to Perform with New Freeze Seal Trailers [Image 3 of 3], by Daniel DeAngelis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.