Personnel assigned to the 6th Air Refueling Wing, walk to a KC-135 Stratotanker aircraft on the flightline of MacDill Air Force Base (AFB), Fla., before a week-long integration training at Shaw AFB, S.C., Nov. 29, 2020. More than 75 personnel from the 6th Air Refueling Wing deployed with three KC-135 Stratotanker aircraft to team up with the 20th Fighter Wing to assess full spectrum readiness capability. (U.S. Air Force photo by Senior Airman Ashley Perdue)
Date Taken: | 11.29.2020 |
Date Posted: | 12.15.2020 14:35 |
Photo ID: | 6456926 |
VIRIN: | 201129-F-TJ728-1011 |
Resolution: | 4871x3252 |
Size: | 4.88 MB |
Location: | SUMTER, SOUTH CAROLINA, US |
Web Views: | 12 |
Downloads: | 12 |
This work, 6th ARW, 20th FW Partner to "Accelerate Change or Lose" [Image 20 of 20], by SSgt Ashley Tsoi, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.