Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Out with the old, in with the new; SJAFB receives new control cab [Image 1 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Out with the old, in with the new; SJAFB receives new control cab

    GOLDSBORO, NORTH CAROLINA, UNITED STATES

    12.17.2020

    Photo by Airman Jordan Colvin 

    4th Fighter Wing   

    Construction workers use a crane to lift materials for the new air traffic control tower at Seymour Johnson Air Force Base, North Carolina, Dec. 17, 2020. The 50 ton tower cabin was lifted 100 feet in the air before being placed in its final position. (U.S. Air Force photo by Airman Jordan Colvin)

    IMAGE INFO

    Date Taken: 12.17.2020
    Date Posted: 12.18.2020 13:10
    Photo ID: 6462321
    VIRIN: 201217-F-FJ742-1026
    Resolution: 7360x4912
    Size: 19.71 MB
    Location: GOLDSBORO, NORTH CAROLINA, US

    Web Views: 24
    Downloads: 15

    PUBLIC DOMAIN