Work crews with Heeter Geotechnical Construction excavate dirt and rock at the Kentucky Lock Addition Project Dec. 16, 2020 at Grand Rivers, Kentucky, where the U.S. Army Corps of Engineers Nashville District is constructing the new 110-foot by 1,200-foot navigation lock at the Tennessee Valley Authority project. (USACE Photo by Leon Roberts)
Date Taken: | 12.16.2020 |
Date Posted: | 12.18.2020 13:56 |
Photo ID: | 6462512 |
VIRIN: | 201216-A-EO110-1001 |
Resolution: | 7360x4912 |
Size: | 25.65 MB |
Location: | GRAND RIVERS, KENTUCKY, US |
Web Views: | 21 |
Downloads: | 12 |
This work, General gets rundown on challenges impacting Kentucky Lock Addition Project [Image 6 of 6], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.