The U.S. Army Engineer Research and Development Center's Dr. Christa Woodley of the Environmental Laboratory signs the weldment -- a significant part of the Underwater Acoustic Deterrent System for invasive Asian carp -- before the 350-ton crane places the weldment into the lock approach of Lock and Dam 19 on the Mississippi River.
Date Taken: | 01.25.2021 |
Date Posted: | 02.26.2021 15:13 |
Photo ID: | 6515961 |
VIRIN: | 210125-A-ZO053-001 |
Resolution: | 1365x1024 |
Size: | 349.98 KB |
Location: | VICKSBURG, IOWA, US |
Web Views: | 37 |
Downloads: | 2 |
This work, Underwater Acoustic Deterrent System installed at Lock, Dam 19 [Image 4 of 4], by Holly Kuzmitski, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.