Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    NMCB 4 constructs Pre-Engineered Building for NBU 7 [Image 1 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    NMCB 4 constructs Pre-Engineered Building for NBU 7

    210317-N-EJ338-0001 SASEBO, Japan (March 17, 2021) Chief Builder Johan Sanchez (left) and Equipment Operator 2nd Class Rene Trejo-Barrera, assigned to Naval Mobile Construction Battalion (NMCB) 4, communicate via hand signals to safely unload a crate containing a roll-up door assembly. The door assembly will be attached to a 3,200-square-foot pre-engineered building that the Seabees are constructing for Naval Beach Unit 7. NMCB 4 is forward-deployed throughout the Indo-Pacific region ready to support major combat operations, humanitarian assistance and disaster relief and to provide general engineering and civil support to U.S. and joint forces. (U.S. Navy photo by Utilitiesman 3rd Class Colin Haydt /Released)

    IMAGE INFO

    Date Taken: 03.17.2021
    Date Posted: 03.29.2021 22:10
    Photo ID: 6574178
    VIRIN: 210317-N-EJ338-282
    Resolution: 1600x1200
    Size: 283.3 KB
    Location: YOKOSE, NAGASAKI, JP

    Web Views: 46
    Downloads: 4

    PUBLIC DOMAIN