Even after flood waters have receded, large debris, such as tree branches, remain behind for the crew to clean up at the Locks and Dams 3 on the Monongahela River in Elizabeth, Pennsylvania, March 2, 2021. High water from snow melts and extended rain affected the U.S. Army Corps of Engineers Pittsburgh District on the Monongahela River in early March. Elizabeth Locks and Dams (L/D 3) was taken out of service as water entered the operating machinery and topped the lock walls. The average time of high-water stopping operation was 30 hours. The lock staff cleared mud and debris, and each lock was returned to service within eight hours of water receding. Elizabeth is one of the oldest functioning locks in the nation, 114 years old. (U.S. Army Corps of Engineers Pittsburgh District Photo by Philip Delo)
Date Taken: | 03.02.2021 |
Date Posted: | 03.30.2021 16:29 |
Photo ID: | 6576675 |
VIRIN: | 210302-A-XX123-006 |
Resolution: | 4032x2268 |
Size: | 2.71 MB |
Location: | PITTSBURGH, PENNSYLVANIA, US |
Web Views: | 21 |
Downloads: | 4 |
This work, High water means high stakes for Pittsburgh locks, dams [Image 7 of 7], by CPT Aaron Moshier, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.