Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Construction complete: East Branch Lake, campgrounds to reopen fully in upcoming ceremony [Image 3 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Construction complete: East Branch Lake, campgrounds to reopen fully in upcoming ceremony

    WILCOX, PENNSYLVANIA, UNITED STATES

    03.26.2021

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Lt. Col. Timothy Butler (center), deputy director, Pittsburgh District, and 1st Lt. Branson Ruddell, walk toward the dam control tower at East Branch Clarion River Lake in Wilcox, Pennsylvania, March 26, 2021, during a tour to prepare for an upcoming ribbon-cutting ceremony and open house event for the public. Since issues with the dam were found in 2008, the Pittsburgh District has implemented various risk reduction measures, one of which was to lower the summer and winter pool levels in order to reduce hydraulic loads on and within the dam embankment. The summer pool level will return to 1670 feet (above sea level) for the first time in more than a decade. (U.S. Army Corps of Engineers Pittsburgh District Photo by Michel Sauret)

    IMAGE INFO

    Date Taken: 03.26.2021
    Date Posted: 04.02.2021 15:44
    Photo ID: 6583105
    VIRIN: 210326-A-TI382-312
    Resolution: 5735x3828
    Size: 3.52 MB
    Location: WILCOX, PENNSYLVANIA, US

    Web Views: 13
    Downloads: 4

    PUBLIC DOMAIN