Twenty-five F-35A Lightning IIs assigned to the 354th Fighter Wing prepare to launch during Arctic Gold 21-2 April 7, 2021, on Eielson Air Force Base, Alaska. Arctic Gold 21-2 is a Phase I and Phase II readiness exercise designed to test the 354th Fighter Wing’s ability to rapidly generate and deploy F-35A Lightning II aircraft, cargo and supporting personnel. (U.S. Air Force photo by Senior Airman Beaux Hebert)
Date Taken: | 04.07.2021 |
Date Posted: | 04.08.2021 13:54 |
Photo ID: | 6590345 |
VIRIN: | 210407-F-RQ702-1225 |
Resolution: | 5547x2980 |
Size: | 1.12 MB |
Location: | EIELSON AIR FORCE BASE, ALASKA, US |
Web Views: | 423 |
Downloads: | 110 |
This work, Eielson AFB generates F-35A fleet for Arctic Gold 21-2 [Image 5 of 5], by SrA Beaux Hebert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.