Water Treatment Operator Carl Moulden prepares a water sample for testing while working on the third shift at the Dalecarlia Water Treatment Plant Dec. 15, 2020. (USACE photo by Christopher Fincham)
Date Taken: | 12.15.2020 |
Date Posted: | 04.26.2021 14:08 |
Photo ID: | 6616497 |
VIRIN: | 201215-A-KB984-1009 |
Resolution: | 2854x3568 |
Size: | 5.32 MB |
Location: | DISTRICT OF COLUMBIA, US |
Web Views: | 12 |
Downloads: | 3 |
This work, Washington Aqueduct Third Shift [Image 18 of 18], by Christopher Fincham, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.