U.S. Army Corps of Engineers, Europe District Resident Engineer Will Adcock checks out the an outdoor garden feature area for students at the nearly completed Wiesbaden Elementary School project in the Hainerberg portion of U.S. Army Garrison Wiesbaden April 23, 2021. The U.S. Army Corps of Engineers built the school in close partnership the Department of Defense Education Activity to provide the children of service members in the Wiesbaden area a new, 21st-century school where they can learn and grow.
Date Taken: | 04.23.2021 |
Date Posted: | 04.30.2021 09:02 |
Photo ID: | 6623702 |
VIRIN: | 210423-A-WZ074-076 |
Resolution: | 6016x4016 |
Size: | 11.67 MB |
Location: | WIESBADEN, HESSEN, DE |
Web Views: | 66 |
Downloads: | 3 |
This work, U.S. Army Corps of Engineers nearly finished with new Wiesbaden Elementary School project [Image 8 of 8], by Christopher Gardner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.