The excavator operator pauses work in order to allow another construction worker to measure the depth of the seepage cutoff wall trench. Following a measurement and a thumbs up, the trench digging resumes.
Date Taken: | 05.26.2021 |
Date Posted: | 05.27.2021 20:14 |
Photo ID: | 6667013 |
VIRIN: | 210527-A-PZ119-0284 |
Resolution: | 2100x1500 |
Size: | 2.8 MB |
Location: | SACRAMENTO, CALIFORNIA, US |
Web Views: | 27 |
Downloads: | 3 |
This work, Reach H levee work in Natomas, California [Image 9 of 9], by Joseph Bruton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.