Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    119th Wing is building on readiness [Image 21 of 27]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    119th Wing is building on readiness

    FARGO, NORTH DAKOTA, UNITED STATES

    06.04.2021

    Photo by Chief Master Sgt. David Lipp 

    119th Wing, North Dakota Air National Guard

    From left to right, U.S. Air Force members of the 119th Civil Engineer Squadron Tech. Sgt. Chad Brinkman, Senior Airman Jack Sullivan and Airman 1st Class Joseph Ellison, perform an initial installation on a mobile aircraft arresting system as Tech. Sgt. Luke Knutson, a Regional Training Site instructor, provides guidance at the North Dakota Air National Guard Base, Fargo, N.D., June 4, 2021. The readiness exercise is designed to prepare all areas of unit personnel for deployment under contested, degraded and operationally limited (CDO) and increased threat-level environments. (U.S. Air National Guard photo by Chief Master Sgt. David H. Lipp)

    IMAGE INFO

    Date Taken: 06.04.2021
    Date Posted: 06.07.2021 15:43
    Photo ID: 6680613
    VIRIN: 210604-Z-WA217-1193
    Resolution: 4528x3016
    Size: 6.8 MB
    Location: FARGO, NORTH DAKOTA, US

    Web Views: 13
    Downloads: 7

    PUBLIC DOMAIN