Lt. Col. Raymond Pifer, an Inspector General Staff member assigned to the 105th Airlift Wing, looks on as Senior Airman Daniel Dwyer and Senior Airman Justin Sealy, members assigned to the 105th Civil Engineering Squadron, report the location of a simulated unexploded ordnance at Stewart Air National Guard Base, N.Y. June 12, 2021. (U.S. Air Force photo by Tech. Sgt. Patrick Espeut)
Date Taken: | 06.12.2021 |
Date Posted: | 06.16.2021 09:45 |
Photo ID: | 6689451 |
VIRIN: | 210612-Z-CK960-8368 |
Resolution: | 2100x1500 |
Size: | 697.61 KB |
Location: | NEWBURGH, NEW YORK, US |
Web Views: | 15 |
Downloads: | 6 |
This work, 105th Airlift Wing Overcomes Challenges During Large-Scale Readiness Exercise [Image 12 of 12], by MSgt Patrick Espeut, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.