Contractors with Scott Construction of Lake Delton, Wis., complete seal-coating work on the roadway near the Main Gate on June 2, 2021, at Fort McCoy, Wis. The project, coordinated by the Fort McCoy Directorate of Public Works, consisted of sealing cracks, applying two coats of mastic sealer, and then repainting the pavement markings on several paved surfaces throughout Fort McCoy. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 06.02.2021 |
Date Posted: | 06.21.2021 17:12 |
Photo ID: | 6691593 |
VIRIN: | 210602-A-OK556-547 |
Resolution: | 2187x1364 |
Size: | 830.43 KB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 2 |
Downloads: | 3 |
This work, Contractors complete seal-coating work around Fort McCoy [Image 7 of 7], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.