CAMP LEMONNIER, Djibouti (July 16, 2021) The Camp Lemonnier Turf Field is cut back so that a drainage system can be installed. After more than 18 months of on-and-off repairs, the Turf Field, located adjacent to Building 659, is now open for base athletic activity. Camp Lemonnier is an operational installation that enables U.S., allied and partner nation forces to be where and when they are needed to ensure security in Europe, Africa and Southwest Asia. (Courtesy photo)
Date Taken: | 07.20.2021 |
Date Posted: | 07.20.2021 07:41 |
Photo ID: | 6741176 |
VIRIN: | 210720-N-AW702-758 |
Resolution: | 998x1331 |
Size: | 515.06 KB |
Location: | CAMP LEMONNIER, DJ |
Web Views: | 73 |
Downloads: | 4 |
This work, Camp Lemonnier Turf Field Reopening [Image 8 of 8], by PO1 Jacob Sippel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.