Construction workers signal cranes lifting a 335,000 pound box truss during the construction of Hangar 7 aboard Marine Corps Air Station Miramar, Calif., Oct. 3. Hangar 7, an addition to Hangar 4, taxi ways and aircraft parking areas are under construction and are on schedule to be completed before the end of next year.
Date Taken: | 10.03.2012 |
Date Posted: | 10.04.2012 12:04 |
Photo ID: | 676070 |
VIRIN: | 121003-M-VN509-044 |
Resolution: | 4296x2484 |
Size: | 5.5 MB |
Location: | MARINE CORPS AIR STATION MIRAMAR, CALIFORNIA, US |
Hometown: | SAN DIEGO, CALIFORNIA, US |
Web Views: | 66 |
Downloads: | 6 |
This work, Building foundations: Miramar creates home for future squadrons [Image 5 of 5], by Cpl Deanne Hurla, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.