A U.S. Air Force contractor works on wiring running across a facility’s ceiling fixtures at Yokota Air Base, Japan, Aug. 9, 2021. Schneider Electric and Yokota agreed on an Energy Saving Performance Contract to upgrade the base’s electric and water systems to reduce usage by up to 30%. (Courtesy photo)
Date Taken: | 08.09.2021 |
Date Posted: | 08.31.2021 20:05 |
Photo ID: | 6810676 |
VIRIN: | 210809-F-F3702-0001 |
Resolution: | 3124x1757 |
Size: | 4.08 MB |
Location: | YOKOTA AIR BASE, TOKYO, JP |
Web Views: | 26 |
Downloads: | 5 |
This work, More power, lower cost, 374th CE updates base power grid [Image 7 of 7], by SrA Hannah Bean, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.